{"id":2886,"date":"2014-02-02T12:12:28","date_gmt":"2014-02-02T20:12:28","guid":{"rendered":"https:\/\/bpapaloalto.org\/newbpa\/?p=2886"},"modified":"2014-02-02T12:12:28","modified_gmt":"2014-02-02T20:12:28","slug":"concept-plans-for-maybell-bike-boulevard","status":"publish","type":"post","link":"https:\/\/bpapaloalto.org\/newbpa\/concept-plans-for-maybell-bike-boulevard\/","title":{"rendered":"Concept Plans for Maybell Bike Boulevard"},"content":{"rendered":"<p style=\"text-align: right;\"><em>Information and commentary provided by Lynnie Melena<\/em><\/p>\n<p>The Transportation Division held the second of the Maybell \u2013 Donald \u2013 Georgia\u00a0Bicycle Boulevard\u00a0Community Outreach Meetings on January 28, 2014<\/p>\n<p>Approximately 25-30 people attended this meeting. At the beginning and again at the end, people had a chance to pore over sets of plans showing concepts for the Maybell-Donald-Georgia Bicycle boulevard.<\/p>\n<p>You can view the detailed presentation drawings here: <a href=\"\/wp-content\/uploads\/2014\/02\/Maybell-drawings-01.30.14.pdf\" target=\"_blank\">Maybell drawings 01.30.14<\/a>\u00a0They consist of five sheets:<\/p>\n<p>#1 is along El Camino Way from West Meadow to El Camino and on Maybell to Thain Way.\u00a0Starting at El Camino Way and W. Meadow, one concept showed bow-outs at that intersection (mostly to benefit peds) and pavement markings to direct bicycles through the intersection. \u00a0There was also a proposal to prohibit parking on west side of El Camino Way approaching the intersection with El Camino in the morning bike commute, and to increase the size of the waiting area for bicycles waiting to cross El Camino at El Camino Way\/Maybell.<\/p>\n<p>#2 and #3 are \u00a0two alternatives along Maybell from Thain Way to Donald Drive. Of the\u00a0several concepts for Maybell, \u00a0the most significant one was to create a 12-foot wide &#8220;shared-use path&#8221; (bikes and peds) on the north side. How it would be delineated (pavers or paint) has not developed. Parking would be prohibited on the south side. Other concepts include painting &#8220;sharrows&#8221; on the roadway (indicating the roadway is to be shared by bikes and cars).<\/p>\n<p>#4 is the Clemo to Amaranta section on Maybell (three alternatives) and Coulombe intersection (two alternatives). One\u00a0concept is a raised textured or painted area within the intersections of Maybell-Amaranta and Maybell-Clemo, or both, or just raised sidewalks, to slow traffic and alert drivers that this is a special area for pedestrians.<\/p>\n<p>#5 is along Donald and Georgia to the Gunn HS Spur Trail. One concept was to create bow-outs where the present bike\/ped path from Gunn meets Georgia and to realign the path (slowing bicyclists down a little) to improve safety for students entering Georgia at that point. \u00a0It would also highlight this bike access point to drivers.<\/p>\n<p>These drawings were all meant to be preliminary ideas, responding to comments from the first meeting, for which staff was seeking feedback. \u00a0Most of the &#8220;group&#8221; part of the meeting was Q and A.<\/p>\n<div><\/div>\n<div>The timeline for this project going forward is as follows:<\/div>\n<div>\n<ul>\n<li>Spring 2014&#8211;Community Meeting #3 <span style=\"text-decoration: underline;\">or<\/span> present concept plans to Planning and Transportation Commission<\/li>\n<li>Summer 2014&#8211;Council approval of concept plans<\/li>\n<li>Fall 2014&#8211;Final design and environmental assessment<\/li>\n<\/ul>\n<\/div>\n<div>\n<p>You can view Jaime Rodriguez presentation here:\u00a0<a href=\"\/wp-content\/uploads\/2014\/02\/Maybell-Bike-Blvd-2nd-Meeting-01-28-14-Presentation.pdf\" target=\"_blank\">Maybell Bike Blvd &#8211; 2nd Meeting &#8211; 01 28 14 Presentation<\/a><\/p>\n<\/div>\n<div><\/div>\n<div><\/div>\n<div><\/div>\n<div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Information and commentary provided by Lynnie Melena The Transportation Division held the second of the Maybell \u2013 Donald \u2013 Georgia\u00a0Bicycle Boulevard\u00a0Community Outreach Meetings on January 28, 2014 Approximately 25-30 people [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","ngg_post_thumbnail":0,"footnotes":""},"categories":[9,29],"tags":[],"class_list":["post-2886","post","type-post","status-publish","format-standard","hentry","category-city-of-palo-alto","category-streets"],"_links":{"self":[{"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/posts\/2886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/comments?post=2886"}],"version-history":[{"count":0,"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/posts\/2886\/revisions"}],"wp:attachment":[{"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/media?parent=2886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/categories?post=2886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bpapaloalto.org\/newbpa\/wp-json\/wp\/v2\/tags?post=2886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}