The Barron Park Association

Feb 022014
 

Information and commentary provided by Lynnie Melena

The Transportation Division held the second of the Maybell – Donald – Georgia Bicycle Boulevard Community Outreach Meetings on January 28, 2014

Approximately 25-30 people attended this meeting. At the beginning and again at the end, people had a chance to pore over sets of plans showing concepts for the Maybell-Donald-Georgia Bicycle boulevard.

You can view the detailed presentation drawings here: Maybell drawings 01.30.14 They consist of five sheets:

#1 is along El Camino Way from West Meadow to El Camino and on Maybell to Thain Way. Starting at El Camino Way and W. Meadow, one concept showed bow-outs at that intersection (mostly to benefit peds) and pavement markings to direct bicycles through the intersection.  There was also a proposal to prohibit parking on west side of El Camino Way approaching the intersection with El Camino in the morning bike commute, and to increase the size of the waiting area for bicycles waiting to cross El Camino at El Camino Way/Maybell.

#2 and #3 are  two alternatives along Maybell from Thain Way to Donald Drive. Of the several concepts for Maybell,  the most significant one was to create a 12-foot wide “shared-use path” (bikes and peds) on the north side. How it would be delineated (pavers or paint) has not developed. Parking would be prohibited on the south side. Other concepts include painting “sharrows” on the roadway (indicating the roadway is to be shared by bikes and cars).

#4 is the Clemo to Amaranta section on Maybell (three alternatives) and Coulombe intersection (two alternatives). One concept is a raised textured or painted area within the intersections of Maybell-Amaranta and Maybell-Clemo, or both, or just raised sidewalks, to slow traffic and alert drivers that this is a special area for pedestrians.

#5 is along Donald and Georgia to the Gunn HS Spur Trail. One concept was to create bow-outs where the present bike/ped path from Gunn meets Georgia and to realign the path (slowing bicyclists down a little) to improve safety for students entering Georgia at that point.  It would also highlight this bike access point to drivers.

These drawings were all meant to be preliminary ideas, responding to comments from the first meeting, for which staff was seeking feedback.  Most of the “group” part of the meeting was Q and A.

The timeline for this project going forward is as follows:
  • Spring 2014–Community Meeting #3 or present concept plans to Planning and Transportation Commission
  • Summer 2014–Council approval of concept plans
  • Fall 2014–Final design and environmental assessment

You can view Jaime Rodriguez presentation here: Maybell Bike Blvd – 2nd Meeting – 01 28 14 Presentation

 Leave a Reply

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

(required)

(required)